Text Size: A A

Bulk Electric System Interconnection Requirements


Emera Maine’s Bulk Electric System Interconnection Requirements assets are available to the public. This is made possible by the North American Electric Reliability Corporation (NERC) Reliability Standard FAC-001-1. Click on the link below to view the Facility Interconnection Requirement. This document lists the various National, Regional, State and Company interconnection requirements specific to generators, transmission and end-users seeking to attach to bulk electric system assets owned by Emera Maine.

Interested parties who wish to interconnect to Emera Maine should contact:

Steve Sloan, Manager of Transmission Development
PO Box 932
Bangor, Maine 04402-0932
(207) 973-2568
Email: steve.sloan@emeramaine.com

Click here to download the Facility Interconnection Requirements document.